Iowa Water Fowlers Forum banner
1 - 15 of 15 Posts

·
IAW Veteran
Joined
·
1,767 Posts
Discussion Starter · #1 ·
the shell has been completed, now the glass work will start.. it has 2 36x24 inch windows 1 39x24 window 2 dog doors still need t add the collapsable ramps.. then the paintng and the cover work starts,
 

·
IAW Veteran
Joined
·
1,767 Posts
Discussion Starter · #5 ·
the blind will be towed behind the decoy boat... it has a twin screw 50lb thrust troller to set it into place... the blind is tied to the landing at night and moved into the marsh when its time to hunt.
 

·
IAW Veteran
Joined
·
1,767 Posts
Discussion Starter · #8 ·
when i get it cleaned up inside will be posting pics.. it has three swivel seats, 2 18x 36x18 inch storage units, and one 36x36x12 inch below deck unit still have to install light bars.:)
 
1 - 15 of 15 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top